Here are the known limitations of Parasoft Jtest:
Unit Test Assistant
Creating unit tests with Unit Test Assistant for large projects may require a lot of memory. If the selected file scope is too large, the memory consumption may exceed the limit of memory allocated to Eclipse.
LLM Integration
LLM integration does not support the CDD and METRIC rules, as well as .properties and .xml files. The Generate Suggested Fix for [rule] option is not available for these items; see Generating a Suggested Fix.
Other
- Running static analysis may require additional memory allocation.
- The violations reported for the DISA-ASD-STIG test configuration may contain duplicates, so the number of violations reported may be larger than the actual number of violations.